Special Process: Plating System Assessment. Product Code: CQI Pricing This manual includes a downloadable assessment with forms to complete the. Recently our company was asked when we will implement the CQI Plating System Assessment Program. Before we can do anything we must find out what it . The goal of the assessment is the development of a plating management system that provides for continual improvement, emphasizing defect prevention and the.

Author: Shaktilabar Kilar
Country: Swaziland
Language: English (Spanish)
Genre: Life
Published (Last): 2 January 2017
Pages: 238
PDF File Size: 1.60 Mb
ePub File Size: 9.50 Mb
ISBN: 796-9-56196-677-1
Downloads: 81800
Price: Free* [*Free Regsitration Required]
Uploader: Mikazahn

Each participant will receive a training manual. Number of “Needs Immediate Action” Findings: Make use of our special know-how and contact us for your consultation interview or for an individual, detailed service offer at no charge and without obligation.

Also called reverse-current cleaning.

Jun 04, Ann Arbor, MI. Non-plated, in-process, and finished product shall be properly segregated and identified. Maintenance data shall be collected and analyzed as part of a predictive maintenance program.

CQI-11 Plating System Assessment

AIAG Organization AIAG is made up of a board of directors, an executive director, executives on loan from member companies, associate directors, a full-time staff, and volunteers serving on project teams. Customer product shall be clearly identified and staged throughout the plating process. The date of the re-assessment shall be given here, and the appropriate Question s from Sections 1 — 5, in the original assessment, shall be modified to reflect that the evidence, relating to the implementation of the corrective action shas been observed.

Barrel Plating Or Cleaning: The process of using electrical current to plate an electrically conductive object with a thin layer of metal.

  LITURGHIERUL 2012 PDF

Plating System Assessments (CQI-11)

Refer to Process Tables. The work of preparing process audits is done by AIAG technical committees. The contents of all published materials are copyrighted by the Automotive Industry Action Group unless otherwise indicated. An alphanumeric format shall be used to avoid confusion with different numeric formats. A crossAre finish process control functional team, including a production operator, shall plans up to syatem and reflecting be used in the development of Control Plans, which current processing?

CQI Plating System Assessment | TopQM-Systems global CQI support in the automotive industry

Date of Re-assessment if necessary: Register by fax Ductility by foil Decorative Test Method: The descipline of precisely identifying lots and linking all pertinent information to them enhances the ability to do root cause analysis and continual improvement. Concerns shall be addressed in a timely manner. All team members involved in the plating management system would benefit from this seminar. The auditor shall verify plater is conforming to customer requirements.

These procedures or work instructions shall be accessible to shop floor personnel. Refer to Process Tables for frequency of checks. Procedures shall be adequate to prevent movement of non-conforming product into the production system. Similar parts can be grouped into part families for this effort as defined by the organization. Appropriate location assessmebt staging within the cqi-1 also help to ensure that orders are not shipped until all required operations are performed.

The organization shall have a process to ensure the timely review, distribution, and implementation of all customer and industry engineering standards and specifications and changes based on customerrequired schedule.

The main task of technical committees is to prepare Automotive Standards and System Requirements. Fo The plater shall have written process specifications for all active processes and identify all steps of assdssment process including relevant operating parameters.

  ELEMENTARY FUNCTIONAL ANALYSIS GEORGI E.SHILOV PDF

We shall gladly provide you with a contact person and contact data for the above-mentioned project and reference examples upon request. Shipping Requirements Were the parts assessmnt identified?

CQI | Plating System Assessments

Feb 19, Ann Arbor, MI. Plate Thickness Test Method: Alloy if Applicable Test Method: Fo na lU Email; Email: The facility may have several buildings or physical locations in the same general area.

Copyright infringement is a violation of federal law subject to criminal and civil penalties. The job audit of one part, one plating process, is not sufficient to use as a basis to complete the other sections of the complete PSA. Appearance Decorative Test Method: Does the plater have the proper customer specifications for the part?

The other three sections on Management Responsibility and Quality Planning, Floor and Material Handling Responsibility, and Equipment are equally if not even more important.

Type s of Plating at this Facility: Please refer to the Maintenance Request Form at the back of this document to submit a request. Non-conforming hold area shall be clearly designated to maintain segregation of such material. All active processes should have a written process specification. Refer to Process Tables for specific parameters.