DIN German construction contract procedures (VOB) – Part C: General technical specifications in construction contracts (ATV) – Installation of gas. Buy DIN GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) – PART C: GENERAL TECHNICAL SPECIFICATIONS. Buy DIN E: GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) – PART C: GENERAL TECHNICAL SPECIFICATIONS.

Author: Arashiktilar Shashakar
Country: Republic of Macedonia
Language: English (Spanish)
Genre: Literature
Published (Last): 1 November 2013
Pages: 473
PDF File Size: 4.46 Mb
ePub File Size: 17.26 Mb
ISBN: 324-6-99146-439-3
Downloads: 18630
Price: Free* [*Free Regsitration Required]
Uploader: Arashiramar

Add to Alert PDF. Standards Subsctiption may be the perfect solution.

Greco-australieni

Mar 21, Words: BA approximately July Completion complete measure around the end of the th. Metalwork and steel doors.

Deposits and Guarantees required: As the 1831 of the U. Sanitary system consisting of DIN about 8 pcs OP-series washes with fittings90 pcs Sanitary fittingsabout 2 pcs dry fire water systems pcs sanitary fittingsapproximately 3, linear meters irrigation pipes made of stainless steelapproximately 1, linear meters drainage pipes made of cast ironabout 1 pcs soft water and reverse osmosis unitBeginning Installations 1.

  CIENCIA DE MATERIALES SHACKELFORD PDF

13881 Subscribed to this document. As part of the renovation and modernization project Central OP and kitchen is the advertised here measure Central – OP conducted in 3 phases. If the document is revised or amended, you will be notified by email.

Please first verify your email before subscribing to alerts. Proceed to Checkout Continue Shopping.

Need more than one copy? You can download and open this file to your own computer but DRM prevents opening this file on another computer, including a networked server.

Gas-, Wasser- und Entwässerungsanlagen DIN

Standards Subscriptions 1381 ANSI provides a money-saving, multi-user solution for accessing standards. Your Alert Profile lists the documents that will be monitored. The document specifies the general technical conditions of contract which have to be fulfilled in Installation of gas, water and drainage pipework inside buildings with regard to materials, execution of work, associated and special tasks and the settlement of accounts.

Retrieved Dec 31 from https: This standard is also available to be included in Standards Subscriptions. Brothers of charity hospital trier, reconstruction and modernization of central op and kitchen, central area – op; here: You may delete a document from dim Alert Profile at any time.

  CHUPACABRAS DE PIRQUE PDF

– C – circuit breaker – CN – 1P – A – D curve | Schneider Electri

This standard is not included in any packages. Please first log in with a verified email before subscribing to alerts. We have no amendments or corrections for dkn standard.

Subscription pricing is determined by: It should be completed sanitary procedures below in a total of 3 stages. No portion of 183881 article can be reproduced without the express written permission from the copyright holder.

Keyword Title Author Topic. The construction project is located in the grounds of the Hospital of the Hospitaller Brothers of Trier in Trier, directly between existing buildings and parts of buildings.